CONTACT US | FAQ | ARTICLES
The project for the Serenbe Community in Georgia was extremely unique, and involved installing a 50 Ton array of Slim Jim lake plates.
The Forks Market project involved replacing an HVAC system with a 400 Ton (HR) assembly submerged in a retention pond.
The Three Pillars Assisted Living project involved installing a 200 Ton (HR) assembly in a retention pond in Wisconsin.
During this project, a 4 Ton (HR) Geo Lake Plate heat exchanger was installed onto the side of a houseboat and “hardwired” to the HVAC system.
This is a prototypical project for a man-made, lined retention pond that has a capacity of 140 Tons (HR).
—Please choose an option—Slim Jim® 304 Stainless SteelGeo Lake Plate® 316L Stainless SteelGeo Lake Plate® 316L Titanium
You will receive the following attachments in an email for your information:
Installation Requirements Info Sheet
Project Information Sheet – (For Slim Jim® and Geo Lake Plate® Exchanger Sizing, please complete this document and return to AWEB Supply)
Slim Jim® Geo Lake Plate Packet