A massive project which consisted of Eleven Slim Jim® assemblies – containing multiple Slim Jim® plates – for the Nashville International Airport.
The King’s Mill Hospital installation project involved installing an array of SJ-10T (304SS) Slim Jim® plates to create 1,400 Ton exchanger system.
The project for the Serenbe Community in Georgia was extremely unique, and involved installing a 50 Ton array of Slim Jim lake plates.
The Forks Market project involved replacing an HVAC system with a 400 Ton (HR) assembly submerged in a retention pond.
The Three Pillars Assisted Living project involved installing a 200 Ton (HR) assembly in a retention pond in Wisconsin.
Arrays of heat exchangers were submerged in Lake Michigan for the Chicago 31st Street Marina’s geothermal system.
This project consisted of designing and installing multiple Slim Jim exchangers within a man-made pond designed to hold the units.
The River Health project consisted of designing and installing multiple low-profile Slim Jim exchangers within the arches of a bridge spanning over a moving river.
In the Phoenix Zoo project, (2) 55 Ton low-profile heat exchangers, with a capacity of 110 (HR), were submerged into a shallow river.
—Please choose an option—Slim Jim® 304 Stainless SteelGeo Lake Plate® 316L Stainless SteelGeo Lake Plate® 316L Titanium
You will receive the following attachments in an email for your information:
Installation Requirements Info Sheet
Project Information Sheet – (For Slim Jim® and Geo Lake Plate® Exchanger Sizing, please complete this document and return to AWEB Supply)
Slim Jim® Geo Lake Plate Packet